Jeff installed the toilet in the basement, the water heater, and fixed the valve to permit water to flow in to the basement.
Dwayne hooked up the grinder to the electrical circuit with a temporary extension cord, so now we have an active toilet indoors and the port-a-potty can be returned.
Adrian, Bill, and Paul shifted the island to its permanent position so that Adrian could drill a pilot hole to check the location of the down draft vent system. It appears that the permanent position of the island will work with Adrian's adjusted ducting in the basement. We also checked out the outside air vent for the wood stove and found that by positioning the stove in the center of the hearth area, its vent will also fit into the current ducting structure. There will still be some adjusting for the exact size and shapes of these critical vents, but for now it appears everything will fit without any significant problems.
Roger from Vigilant Security was out to run wires and position them for the keypads that will control the system. One keypad will go on the laundry room wall near the main entrance, the other in the master bedroom behind the closet door. Both locations used interior walls so running the wiring was less complicated.
Bill and Jonas moved the maple stair treads from the shed to the house and began the process of measuring the treads and risers. They were also involved with planning down and sawing the long hemlock boards that will form the risers.
The crew of Cody, Chris, and John worked on the exterior siding finishing up some of the trim work on the west wall and the installed flashing at the base of the west wall up to the rear door. They also strung lines on the siding fabric to guide installing the siding.
Kohlhepps from DuBois arrived at lunchtime and took measurements for the granite tops. He used a laser photo system and took with him sinks and faucets in order to exactly fit the cuts to the dimensions of these items.
John and Chris worked on cutting and installing some window sills on the bump out windows.
Bill and Jonas installed several of the maple treads on the stairs going up to the first landing. They will cover the maple with cardboard to protect it from scrapes.
It started raining here about noon time and has been on and off, mostly on, all day with temps in the low 40s.
The some flowers have survived the chickens' "care". It's good to find a few things they don't prefer for dinner. The lilies of the valley seem to like the north side while the columbine and bleeding heart are doing well on the east side.
Reading Elizabeth Street Fabiano **** based on her family's history of Italian immigrants in NY in early 1900's