It seems a bit odd to have the laundry room at the front door, but it will be hidden in a closet. It was more important to me to have it on the main floor. So it was roughed in today and the basic plumbing was also. The machines are stacked so we'll have a small hanging/folding area in the closet too.
The crew dry-walled around the door and over the old window in the garage. It is nicely insulated. It's nice to have the light switches at a normal level now. Yesterday we had to stretch high over the door to the temporary switch location.
In 2003 we bought 58.92 acres on a hillside in Julian, Pa. We call it our Barony and this is its unfolding chronicle. Construction of Phase I (Carriage House) ended in 2004; Phase II (Main House) ended in 2010. Phase III is never ending. Visitors to our tale are invited to leave a comment.
Showing posts with label garage. Show all posts
Showing posts with label garage. Show all posts
Monday, March 15, 2010
Saturday, August 6, 2005
Subscribe to:
Posts (Atom)


