Dwayne installed the 5 spots in the kitchen, although the spots need some new bulbs, 50 watt, PAR20 medium base 120 volt halogen bulbs to be exact.
Harry Burd arrived to give us our final building code inspection. He used the exterior stairs that Doug had built for the bumpout door and checked the other door that had been disabled by removing the door handle. The rest of his inspection involved checking the electrical receptacles on the great room wall and in the kitchen. Everything passed with flying colors and Harry will issue the occupancy certificate to Huston Twp, Envinity, and us. With that we will be able to transition the construction loan to the permanent mortgage.
With the achievement of the occupancy certificate milestone, our construction phase II is complete. Move in date is a moving target, but we have our 'cast and crew' party scheduled for
this coming Saturday (July 31), so we will likely be(somewhat) moved in by then.
Hoss and Empress visited for their inspection: 5' black rat snake greeted them in the coop.
Hoss and Empress visited for their inspection: 5' black rat snake greeted them in the coop.