Jeff worked on the all three bathrooms today, the shower in the master bath, the vanity sink in the powder room, and the claw foot tub in the loft bath.
Dwayne and crew got the emergency electrical generator fired up and running today for the first time. It is fairly quiet and will not present a noise problem for sleeping in the rooms on the west side of the house. Dwayne installed a hook for the pendant light in the loft bath, closet lights in the two bedroom closets, lights in all the knee wall (foxhole) closets, and ran another electrical wire to correct the short under the loft catwalk. All the outside lights are now installed and functional, including the lanterns at the basement door, the two bumpout doors, and the rear entry door which has a hanging lantern similar to the front entry. The breezeway rear entry has two small but strong spot lights.
The paint crew was active today and now the door to the kitchen and the door to the garage are the same color as the breezeway walls. The window seat and the knee wall closet doors were given a nice finish coat. They also applied touchup to minor dings around the house.
Doug and Chris were hard at work finishing up the insulation and aluminum panels on the basement walls. With the panels in place they also applied interior trim to the basement door and one of the two basement windows. The door trim was complicated by an intrusion sensor from our security system, but Doug called the security company and got them to ignore the warnings from our sensor until it was reinstalled on the new trim board. This was Chris' last day on the job as he heads off on vacation tomorrow, so that's a sign that work is quickly coming to an end.
Doug installed the main entry brass oak leaf door knocker from the 2009 State College Arts Festival, how appropriate that this is the week of the 2010 Artsfest.
Dwayne and crew got the emergency electrical generator fired up and running today for the first time. It is fairly quiet and will not present a noise problem for sleeping in the rooms on the west side of the house. Dwayne installed a hook for the pendant light in the loft bath, closet lights in the two bedroom closets, lights in all the knee wall (foxhole) closets, and ran another electrical wire to correct the short under the loft catwalk. All the outside lights are now installed and functional, including the lanterns at the basement door, the two bumpout doors, and the rear entry door which has a hanging lantern similar to the front entry. The breezeway rear entry has two small but strong spot lights.
The paint crew was active today and now the door to the kitchen and the door to the garage are the same color as the breezeway walls. The window seat and the knee wall closet doors were given a nice finish coat. They also applied touchup to minor dings around the house.
Doug and Chris were hard at work finishing up the insulation and aluminum panels on the basement walls. With the panels in place they also applied interior trim to the basement door and one of the two basement windows. The door trim was complicated by an intrusion sensor from our security system, but Doug called the security company and got them to ignore the warnings from our sensor until it was reinstalled on the new trim board. This was Chris' last day on the job as he heads off on vacation tomorrow, so that's a sign that work is quickly coming to an end.
Doug installed the main entry brass oak leaf door knocker from the 2009 State College Arts Festival, how appropriate that this is the week of the 2010 Artsfest.
We told Doug we were going to the Peoples Art Fest in Boalsburg. He suggested we look for Dave Ferree, a Centre Hall wood crafter whose house he worked on. We talked to Dave for quite a while.about how much respect we have for Doug and the team at Envinity.