Showing posts with label rosin paper. Show all posts
Showing posts with label rosin paper. Show all posts

Tuesday, March 23, 2010

Maple floor

Posts were routed for the flooring. It looks like the floor was put down first and the tree and other posts placed on top.  Red rosin paper is placed under the maple floor to help prevent squeaks.
 Dwayne showed off the main electrical panel—there will be a transfer panel and then the generator panel to the right of the main.
 Adrian has HVAC stuff laid out like puzzle pieces.
Jonas is working on the second and third posts on the landing—2 are now attached with hardware and he is notching out the third right now.