Scott and Jesse have all the blue stone cut for the base of the hearth. The cement will set up overnight with a fan on it moving air around.
The Kohlhepps guys installed the countertops--kitchen Madura Gold, master bathroom sink Verde San Fransisco, and guest bathroom sink Paradisio.
Bill has placed the support bracket on the stairs going down to the basement landing and he mortised the hinges for the gate in the loft. It's easily removable, but also folds flat against the railing.
Adrian and Dwayne have installed the fluid manifold as well as the master pump. Adrian wants to get the heat pump working by tomorrow, for the AC rather than the heat, I'm sure: today was in the mid 80's and humid.
Just as important: no freeranging Buddy today.








